FMC Paradise Peak — an update

  • Published:
Mining, Metallurgy & Exploration Aims and scope Submit manuscript

Abstract

The paper presents an update of the Paradise Peak mill after the first year of operation. Process revisions, equipment modifications and additions, and personnel requirements are discussed with a comparison to original design. All areas of milling are discussed including crushing, grinding, leach/ counter current decantation (CCD), precipitation, refinery, and heap leach.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

SME preprint 88–140, SME Annual Meeting, Phoenix, AZ, January 1988. Discussion of this paper must be submitted, in duplicate, prior to Jan. 31, 1989.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Wilmot, C.I. FMC Paradise Peak — an update. Mining, Metallurgy & Exploration 5, 202–206 (1988). https://doi.org/10.1007/BF03402510

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF03402510

Navigation