Skip to main content
Log in

Design for high performance assurance for offshore production facilities in remote harsh and sensitive environments

  • Published:
OPSEARCH Aims and scope Submit manuscript

Abstract

During the last years there has been increasing interest in developing oil and gas fields in the Barents Sea north of the Polar circle, in the Arctic. However, there exists little experience and data with respect to operating in such a harsh climate, a sensitive environment and remote location. Hence, it is expected that one will face many challenges in developing offshore production facilities with respect to production regularity. The aim of this paper is to discuss production regularity for production facilities used in Arctic conditions and locations. Furthermore, we propose a model for decision-making with respect to regularity during the design phase. The model highlights important aspects to consider when deciding on what equipment to choose for achieving the regularity goals in the Arctic.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Barabady, J. (2007). Production assurance: concept, implementation and improvement, Doctorial Thesis No 2007:51, Luleå University of Technology, ISSN: 1402-1544, ISRN: LTU-DT-07/51-SE.

  2. Braset, E. (2007). Vinterisering av mobile innretninger [Winterization of mobile installations], In Norwegian, Master degree thesis, University of Stavanger, Norway.

    Google Scholar 

  3. Dybfest, M. (2008). Discussion of offshore production regularity in Arctic locations, Master degree thesis, University of Stavanger, Norway

    Google Scholar 

  4. Drage, M.A. and Mølmann, T. (2003): Arctic costal climate impact on design construction and operations of Hammerfest LNG plant, In: Proceedings of the 17th International conference on port and ocean engineering under arctic conditions POAC03, Trondheim, Norway, June 16–19, p. 421–429.

    Google Scholar 

  5. Freitag, D.R. and McFadden, T. (1997). Introduction to cold region engineering, ASCE Press ISBN-10: 0784400067, ISBN 0–7844-0006–7, New York.

    Book  Google Scholar 

  6. Gao, X., Markeset, T. and Kumar, U. (2007a). A Review of Production Assurance in the Norwegian Petroleum Industry, In: Proceedings of the Seventh International Conference on Reliability, Maintainability and Safety (ICRMS2007), ISBN 978-7-80144-682-4, August 20–26th, Beijing, China

    Google Scholar 

  7. Gao, X. and Markeset, T. (2007b). Design for Production Assurance Considering Influence Factors, In: Proceedings of the European Safety and Reliability Conference (ESREL2007), ISBN 978-0-415-44786-7, June 25–27th, Stavanger, Norway.

    Google Scholar 

  8. Gudmestad, O.T., Alhimenko, A.I., Løset, S., Shkhinek, K.N., Tørum, A. and Jensen, A., (2007). Engineering aspects related to Arctic offshore developments, ISBN 5-8114-0723-8, LAN Publishing House, St Petersburg, Russia.

    Google Scholar 

  9. Gudmestad, O.T., Zolothukhin, A.B., Ermakov, A.I., Jacobsen, R.A., Michtchenko, I.T., Vovk, V.S., Løset, S. and Shkinek, K.N. (1999). Basic of offshore petroleum engineering and development of marine facilities with emphasis on the Arctic offshore, ISBN 5-7246-0100-1.

  10. Larsen, A. and Markeset, T. (2007), Mapping of Operations, Maintenance and Support Design Factors in Arctic Environments, In: Proceedings of the European Safety and Reliability Conference (ESREL2007), ISBN 978-0-415-44786-7, June 25–27th, Stavanger, Norway.

    Google Scholar 

  11. ISO 20815 (2008). Petroleum, petrochemical and natural gas industries-Production assurance and reliability management, http://www.iso.orgiso/iso_catalogue/catalogue_tc/catalogue_detail.htm?csnumber=39744, accessed August 14, 2008.

  12. Markeset, T. and Dybfest, M. (2008). Design for petroleum production in Arctic locations considering maintenance, support services and life cycle costs, In the Proceedings of the mine planning and equipment selection conference (MPES2008), October 20–22nd, Beijing, China.

    Google Scholar 

  13. NORSOK Z-016 (1998), Regularity management & reliability technology, Revision 1, December 1998, http://www.standard.no/imaker.exe?id=563, Accessed August 14th, 2008.

  14. NPD (2008)., Facts 2008 – The petroleum Sector, (NPD: Norwegian Petroleum Directorate), http://www.npd.no/English/Produkter+og+tjenester/Publikasjoner/Faktaheftet/Faktaheftet+2008/fakta2008.htm, accessed August 14, 2008.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Tore Markeset.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Markeset, T. Design for high performance assurance for offshore production facilities in remote harsh and sensitive environments. OPSEARCH 45, 275–290 (2008). https://doi.org/10.1007/BF03398819

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF03398819

Keywords

Navigation