Asarco’s new electrolytic plant at corpus christi, texas

  • Transaction
  • Published:
JOM Aims and scope Submit manuscript

Abstract

During 1953 the American Smelting and Refining Co. completed construction of an addition to its Corpus Christi operations. This addition was designed to treat fume from Asarco’s El Paso and Chihuahua slag fuming plants. The capacity of the plant is from 80 to 90 tons of special high grade zinc for a 24-hr period. Power for the new addition is purchased locally and converted, using mercury arc rectifiers.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. AIME Trans., 1944, vol. 159, p. 194.

Download references

Author information

Authors and Affiliations

Authors

Additional information

TP 4431 D. Manuscript, Nov. 25, 1955. New Orleans Meeting, February 1957.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Jephson, A.C., Allen, R.E. Asarco’s new electrolytic plant at corpus christi, texas. JOM 9, 1381–1384 (1957). https://doi.org/10.1007/BF03398321

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF03398321

Navigation