Abstract
Preliminary results secured with a novel reactor for contacting hot metal with gaseous oxygen. Sufficient data have not been obtained to present a complete picture of the effect of all the variables nor to evaluate the process as a commercial tool, but results obtained are of sufficient theoretical and practical interest to present at this time.
Similar content being viewed by others
References
E. C. Wright: Iron and Steel Engineer, vol. 33, pp. 73 to 85, 1956.
P. Coheur and H. Kosmider: Metal Progress, vol. 72, p. 71, 1957.
B. Kalling and F. Johansson: Blast Furnace and Steel Plant, p. 202, Feb. 1957.
H. A. Trenkler: Three Years of LD Steel, VOEST, 1956, p. 15.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Gaines, J.M., Hilty, D.C. Hot-metal pre-treating tower. JOM 10, 452–455 (1958). https://doi.org/10.1007/BF03398228
Published:
Issue Date:
DOI: https://doi.org/10.1007/BF03398228