Skip to main content
Log in

Metallurgy of Cobalt Production From Cupriferous Pyrite

  • Transaction
  • Published:
JOM Aims and scope Submit manuscript

Abstract

Japanese wartime economy demanded domestic cobalt production. This paper describes a process operated for two years at the Besshi mine and smelter on extremely low grade (0.1 pet Co) pyrite concentrates obtained from copper ore. The steps in the process were roasting, leaching, precipitation, reduction fusion to crude cobalt, and finally refining by electrolysis to 99+ pet.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Discussion of this paper, TP 3045D, may be sent (2 copies) to AIME by Aug. 1, 1951. Manuscript, July 21, 1949; revision, Aug. 16 1950. St. Louis Meeting, February 1951.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Nakabe, S. Metallurgy of Cobalt Production From Cupriferous Pyrite. JOM 3, 445–451 (1951). https://doi.org/10.1007/BF03397328

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF03397328

Navigation