Abstract

The Central Artery/Tunnel Project in Boston is the largest and most complex highway project ever undertaken in the core of a major American city. The project will replace an existing elevated highway, which passes through Boston’s historic downtown, with a new underground expressway. In 1984 a Section 106 Memorandum of Agreement (MOA) between transportation authorities and historic preservation agencies set stipulations designed to preserve and protect archaeological and historic resources within and adjacent to the project right-of-way. Started in the earliest planning stages of the project, the Central Artery/Tunnel Project Preservation Program implemented the MOA through historic structure survey and recording projects, review of future development plans, the Project Conservator Program to protect buildings during construction, and archaeological survey, site examination, and data recovery. The program has surveyed over 450 historic structures, developed guidelines and specifications for protection of potentially impacted historic structures, provided criteria for building and construction monitoring programs, identified and recovered four National Register eligible archaeological sites, and conducted a public information and education program.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Advisory Council on Historical Preservation 1984 Memorandum of Agreement: Third Harbor Tunnel/ Central Artery, Boston, Massachusetts. Manuscript, Massachusetts Historical Commission, Boston.

    Google Scholar 

  • Cook, Lauren J., Joseph Balicki, and J. N. Leith Smith 1994 Central Artery/Tunnel Project Phase II Site Examination Town Cove Archaeological Site, Study Block TC04, Boston, Massachusetts. Prepared by Timelines, Inc./John Milner Associates, Inc., Groton, MA/West Chester, PA. Submitted to Central Artery/ Tunnel Project, Bechtel/Parsons Brinckerhoff, Boston.

  • Elia, Ricardo J., and Nancy S. Seasholes 1989 Phase I Archaeological Investigations of the Central Artery/Third Harbor Tunnel Project, Boston, Massachusetts. Report of Investigations 78. Prepared by Office of Public Archaeology, Boston University, Boston. Submitted to Massachusetts Department of Public Works I-90/I-93 Project, Boston.

  • Elia, Ricardo J., David B. Landon, and Nancy S. Seasholes 1989 Phase II Archaeological Investigations of the Central Artery/Third Harbor Tunnel Project, Boston, Massachusetts. Report of Investigations 81. Prepared by Office of Public Archaeology, Boston University, Boston. Submitted to Massachusetts Department of Public Works I-90/I-93 Project, Boston.

  • Massachusetts Department of Public Works 1990 Historic Resources. Final Supplemental Environmental Impact Report: Central Artery, Boston, Massachusetts. Part I, Book 2, Chapter 10. Massachusetts Department of Public Works, Boston.

    Google Scholar 

  • Massachusetts Highway Department 1992 Digging into Boston’s Past: An Introduction to Archaeology. Massachusetts Highway Department, Boston.

    Google Scholar 

  • McGinley-Hart Associates 1988 Preliminary Study Report of the Project Conservator: Potential Effects of Construction on Historic Structures. Prepared by McGinley-Hart Associates, Boston. Submitted to the Massachusetts Department of Public Works, Boston.

  • National Park Service 1992 The Secretary of the Interior’s Standards for the Treatment of Historic Properties. National Park Service, Preservation Assistance Division, Washington.

    Google Scholar 

  • Timelines, Inc. 1994 Central Artery/Tunnel Project Archaeological Contingency Implementation Program. Prepared by Timelines, Inc., Groton, MA. Submitted to Central Artery/Tunnel Project, Bechtel/Parsons Brinckerhoff, Boston.

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Bower, B.A. The central artery/tunnel project preservation program. Hist Arch 32, 11–18 (1998). https://doi.org/10.1007/BF03374255

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF03374255

Navigation