Skip to main content
Log in

Technology for mining a shaft pillar in the Sherengeshevsk deposit

  • Opencast and Underground Mining
  • Published:
Journal of Mining Science Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

References

  1. Provisional Regulations for Protecting Structures and Natural Objects from Harmful Effects of the Underground Mining of Deposits with Undetermined Rock Shifts [in Russian], VNIMI (All-Union Scientific, Research Institute of Mine Surveying), Leningrad (1986).

  2. A. G. Shadrin, Theory and Calculation of the Shifting of Rocks and the Earth's Surface [in Russian], Krasnoyarsk (1990).

  3. I. D. Rivkin and V. M. Kucher, “Conditions of stability of rocks above blind ore beds,” Bezop. Tr. Promysh., No. 8 (1969).

  4. O. Zenkevich, The Finite-Elements Method in Engineering [Russian translation], Mir, Moscow (1975).

    Google Scholar 

Download references

Authors

Additional information

Mining Institute, Siberian Branch of the Russian Academy of Sciences, Novosibirsk. Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 50–55, July–August, 1998.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Koren'kov, É.N., Pashkevich, A.A., Seryakov, V.M. et al. Technology for mining a shaft pillar in the Sherengeshevsk deposit. J Min Sci 34, 320–324 (1998). https://doi.org/10.1007/BF02803693

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02803693

Keywords

Navigation