Skip to main content
Log in

Layout of monitoring and measuring, instruments in hydraulic structures

  • Readers’ Letters and Comments
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

References

  1. V. I. Bryzgalov and V. A. Stafievskii, “Organization of monitoring of the state of structures at the Sayano-Shushenskoe hydroelectric station,” Gidrotekh. Stroit., No. 12 (1993).

  2. A. I. Demidov and E. A. Smironov, “State of the Vilyui hydroelectric station dam,” in: Collection of Scientific Works [in Russian], Gidroproekt, Moscow, No. 84 (2982).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 2, pp. 52–53, February, 1997.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Pekhtin, V.A. Layout of monitoring and measuring, instruments in hydraulic structures. Hydrotechnical Construction 31, 132–134 (1997). https://doi.org/10.1007/BF02766876

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02766876

Keywords

Navigation