Skip to main content
Log in

Prospects of developing hydropower construction in the Far East

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

The examined objects of hydropower construction are needed for supporting normal life in the regions in the near future. During further planning works it is necessary to search for ways to increase the profitability of the objects and reduce the volume of the start-up complexes and construction time; for each object to work out investment plans with suggestion of potential investors including joint-stock companies with the attraction of state and private domestic and foreign capital.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. V. M. Boyarskii, A. V. Vasil'ev, V. V. Sokolov, and Yu. A. Grigor'ev, “Bureya multipurpose hydro development on the Bureya River,” Gidrotekh. Stroit., No. 8 (1995).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 2, pp. 7–9, February, 1997

Rights and permissions

Reprints and permissions

About this article

Cite this article

Boyarskii, V.M., Apollonov, Y.E., Botvinov, B.G. et al. Prospects of developing hydropower construction in the Far East. Hydrotechnical Construction 31, 70–73 (1997). https://doi.org/10.1007/BF02766861

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02766861

Keywords

Navigation