Skip to main content
Log in

Use of activate sludge model no. 3 and Bio-P module for simulating five-stage step-feed enhanced biological phosphorous removal process

  • Published:
Korean Journal of Chemical Engineering Aims and scope Submit manuscript

Abstract

The ASM3 with EAWAG Bio-P Module (ASM3+P) was used for simulating a five-stage step-feed Enhanced Biological Phosphorous Removal (fsEBPR) process and its applicability was compared with the ASM2d. The fsEBPR process was predicted to achieve effective nitrogen and phosphorus removal from the wastewater even with low C/N and C/P ratios without additional carbon sources. Application of the ASM3+P on this configuration will be an ample chance for expanding the new models in the activated sludge process. Sensitivity analysis and parameter estimation were conducted with the ASM2d and the ASM3+P prior to model application so that calibration of the models could focus only on the sensitive parameters. The ASM2d was less successful for predicting the process behavior. Moreover, the ASM2d required 6 times more computation time than that for the AMS3+P due to its decay-regeneration model structure. To confirm the applicability of parameters determined from the pilot-scale reactor operating results, those were tested on the field data without further correction. Only the ASM3+P successfully predicted nitrogen and phosphate variations in the full-scale plants. Overall examination of simulation results using the pilot and full-scale data has led to the conclusion that the ASM3+P is better than the ASM2d for simulating fsEBPR processes.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • AWWA, Standard methods for the Examination of Water and Waste-water, 20th ed., APHA/AWWA/WEF, Washington, DC (1998).

    Google Scholar 

  • Barker, P. S. and Dold, P. L., “Denitrification behaviour in biological phosphorus removal activated sludge system-review paper,”Wat. Res.,30(4), 769 (1996).

    Article  CAS  Google Scholar 

  • Brdjanovic, D., van Loosdrecht, M G M., Versteeg, P., Hooijmans, C. M., Alaerts, G J. and Heijnen, J. J., “Modelling COD, N and P removal in a full-scale WWTP Haarlem Waarderpolder,”Water Res.,34, 846 (2000).

    Article  CAS  Google Scholar 

  • Gujer, W., Henze, M., Mino, T., Matsuo, T., Wentzel, M. C. and Marais, G V. R., “Activated sludge model no. 2: biological phosphorus removal,”Wat. Sci. Tech.,31(2), 1 (1995).

    Article  CAS  Google Scholar 

  • Gujer, W., Henze, M., Mino, T., Matsuo, X. and van Loosdrecht, M. C. M., “Activated sludge model no. 3,”Wat. Sci. Tech.,39(1), 183 (1999).

    Article  CAS  Google Scholar 

  • Hao, X., van Loosdrecht, M. C. M., Meijer, S. C. F. and Qian, Y., “Model-based evaluation of two BNR processes -UCT and A2N,”Wat. Res.,35(12), 2851 (2001).

    Article  CAS  Google Scholar 

  • Henze, M., Gujer, W., Mino, X and van Loosdrecht, M. C. M.,Activated sludge models: ASM1, ASM2, ASM2d and ASM3, IWA Publishing (2000).

  • Kim, J. R., Ko, J. H., Lee, J. J., Kim, S. H., Park, X J., Kim, C. W. and Woo, H. J., “Parameter sensitivity analysis for activated sludge models no. 1 and 3 combined with one-dimensional settling model,”Wat. Sci. Tech., in press (2005).

  • Lee, K. H., Lee, J. H. and Park, X I, “Simulatenous organic and nutrient removal from municipal wastewater by BSACNR process,”Korean J.Chem. Eng.,15, 9(1998).

    Article  CAS  Google Scholar 

  • Lee, S. H., Ko, J. H., Poo, K. M., Lee, X H, Kim, C. W. and Woo, H. J., “Practical approach of parameter estimation for ASM3+Bio-P module applying for five-stage step-feed EBPR process,”Wat. Sci. Tech., in press (2004).

  • Park, J. B., Han, W L., Lee, S. Y., Lee, J. O., Choi, E. S., Park, D. H. and Park, Y K., “The microbial community analysis of 5-stage biological nutrient removal process with step-feed system,”J. Microbial. Biotechnol.,12(6), 929 (2003).

    Google Scholar 

  • Press, W H., Teukolsky, S. A., Vetterling, W X and Flannery, B. P., Numerical recipes in FORTRAN, 2nd edn, Cambridge university Press, Cambridge CB2 1RP, pp. 854–857 (1992).

    Google Scholar 

  • Rieger, L., Koch, G., Kuhni, M., Gujer, W. and Siegrist, H., “The EAWAG bio-P module for activated sludge model No. 3,”Wat. Res.,35(16), 3887(2001).

    Article  CAS  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Chang-Won Kim.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lee, SH., Ko, JH., Park, JB. et al. Use of activate sludge model no. 3 and Bio-P module for simulating five-stage step-feed enhanced biological phosphorous removal process. Korean J. Chem. Eng. 23, 203–208 (2006). https://doi.org/10.1007/BF02705717

Download citation

  • Received:

  • Accepted:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02705717

Key words

Navigation