Summary

The joints on the wall of a 665 m long unlined access tunnel to a cavern system were mapped along a horizontal scan line. Several outcrops close to the tunnel were mapped in the same manner.

The data were analysed plotting the joint directions on equal area stereographic plots. The mean joint directions were determined from the plots. The results obtained from the tunnel and from the outcrops are very similar and in good agreement with the impression the geologists got during the construction of the cavern system.

The joint distances were analysed by drawing histograms of all the joints measured in the access tunnel and on the outcrops. Curves of Weibull distribution were fitted to the histograms.

When the joints were grouped according to the joint directions it was possible to calculate the true mean joint distances of the different joint sets based on the mapping along a straight horizontal scan line.

Résumé

Le relevé des fissures a été fait en mesurant les directions des fissures du rocher dans la paroi d'un tunnel d'une longueur de 665 mètres, tunnel non revétu conduisant à un entrepôt creusé dans le roc. Dans les parties découvertes du rocher, au-dessus du tunnel, le relevé a été fait de la même façon.

Les résultats ont été traités en dessinant la direction des fissures en projection stéréographique où la surface est exacte. Sur la base des dessins, on a déterminé les directions moyennes des fissures. En comparant les résultats obtenus dans le tunnel et dans les parties découvertes, on a pu constater qu'ils donnaient de la fissuration du rocher une image semblable à celle qu'avaient obtenue les géologues lors de la construction de l'entrepôt.

Les intervalles entre les fissures ont été analysés en dessinant les histogrammes pour toutes les fissures mesurées dans le tunnel et dans les parties découvertes. On a appliqué aux histogrammes les courbes de distribution de Weibull.

Les fissures ont été groupées selon leurs directions principales et il a été possible de calculer les véritables intervalles moyens entre les fissures. On a ainsi pu définir la taille moyenne des blocs de rocher sur la base du relevé horizontal effectué.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • CARTNEY S.A. (1977): The ubiquitous joint method. Cavern design at Dinorwic power station. Tunnels and Tunneling, Vol. 9, No 3/1977, 54–58.

    Google Scholar 

  • FINNISH GEOTECHNICAL SOCIETY (1979): Instructions on the Investigation for Rock Construction (in Finnish), (Rakennusalan kalliotutkimusohjeet). To be published, appr. 60 pp

  • GARDEMEISTER R.—JOHANSSON S.—KORHONEN P.— PATRIKAINEN P.—TUISKU T.—VÄHÄSARJA P. (1976): The Use of the Engineering Geological Rock Classification (in Finnish), (Rakennusgeologisen kallioluokituksen soveltaminen), Technical Research Centre of Finland, Geotechnical Laboratory, Report No. 25, 42 pp.

  • KORHONEN K-H.—JÄÄSKELÄINEN H. (1972): The quantities of rock blasted in Finland in 1960–1980 (in Finnish), (Louhintamäärät Suomessa vv. 1960–1980). Rakennustekniikka Vol. 7, No. 1/1972, 33–40.

    Google Scholar 

  • KORHONEN K-H.—GARDEMEISTER R.—JÄÄSKELÄINEN H.—NIINI H.—VÄHÄSARJA P. (1974): Engineering Geological Rock Classification (in Finnish), (Rakennus-geologinen kallioluokitus). Technical Research Centre of Finland, Geotechnical Laboratory, Report No. 12, 72 pp.

  • SÄRKKÄ P. (1975): Statistical analysis of jointing (in Finnish), (Rakoilun tilastollisesta analysoinnista). Helsinki University of Technology. Unpublished thesis, 75 pp.

  • VASIL'EV M.V.—ZOTEEV V.G.—MOROZOV V.N. (1978): Predicting the block size of the rocks of ore deposits. Soviet Mining Sciences, Vol. 13, No. 6/1977 (English translation) 557–561.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Saari, K., Ylinen, A. Mapping of joints in Pre-cambrian granitic rock masses. Bulletin of the International Association of Engineering Geology 19, 190–195 (1979). https://doi.org/10.1007/BF02600474

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02600474

Keywords

Navigation