Abstract
A model is suggested for open working of inclined stratified deposits combined with the use of longitudinal and transverse mining systems. The effect of the sequence of forming a quarry field on the regime of mining operations is evaluated and recommendations are made for stabilizing it.
Similar content being viewed by others
References
A. S. Tanaino,Automation of Quarry Planning. Mining-Geometry Calculations [in Russian], Nauka, Moscow (1986).
V. I. Kuznetsov and P. P. Menshonok, “Technology for working deposits with a change in direction for mining front advance,” Ugol, No. 12 (1997).
Additional information
Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk. Tranlated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 81–88, November–December, 1999.
Rights and permissions
About this article
Cite this article
Vasilyev, Y.I., Zaitseva, A.A. & Cheskidov, V.I. Mining regime stabilization in working inclined deposits by blocks. J Min Sci 35, 633–639 (1999). https://doi.org/10.1007/BF02550299
Received:
Issue Date:
DOI: https://doi.org/10.1007/BF02550299