Unwatering the Divide Cut of the Tennessee-Tombigbee Waterway: A major challenge to construction

  • Marvin D. Simmons
Article
  • 19 Downloads

Abstract

The construction of the Divide Cut of the Tennessee-Tombigbee Waterway required excavation of more than 150 million cubic yards of unconsolidated sand and clay To make this excavation required lowering the artesian groundwater table as much as 100 feet Lowering of the artesian head was accomplished with deep wells, while the gravity groundwater was removed by trenching Environmental considerations required predicting and monitoring the drawdown of groundwater in the area of the canal More than 1,000 piezometers were used to monitor construction excavation and the spread of the drawdown cone The 280-foot bottom width canal was successfully completed ahead of schedule with the groundwater safely controlled through permanent relief wells

Keywords

Excavation Trench Piezometric Level Piezometric Surface Perched Water Table 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References Cited

  1. Boswell, E. H., 1965, Cretaceous aquifers of northeastern Mississippi: U.S. Geological Survey Bulletin 63-10, 202 p.Google Scholar
  2. Boswell, E. H., G. K. Moore, L. M. MacCary, 1965, Cretaceous aquifers in the Mississippi embayment: U.S. Geological Survey Professional Paper 448-C, 36 p.Google Scholar
  3. Cushing, E. M., E. H. Boswell, R. L. Hosman, 1964, General geology of the Mississippi embayment: U.S. Geological Survey Professional Paper 448-B, 28 p.Google Scholar
  4. Johnson, E. E., Inc., 1966, Groundwater and wells: St. Paul, MN, 440 p.Google Scholar
  5. LaMoreaux, P. E. and Associates, 1979, Hydrologic impact of dewatering the Divide Section of the Tennessee-Tombigbee Waterway: Tuscaloosa, Alabama, 63 p.Google Scholar
  6. Stephenson, L. W., W. H. Monroe, 1959, The Upper Cretaceous deposits: Miss. State Geol. Survey Bull., v. 40, p. 25–94.Google Scholar
  7. Strack, O D L., H. M. Haitjema, J. J. Melnyk, 1980, Inter-active modeling of the aquifers near the Tennessee-Tombigbee Waterway: IFAC Symposium, Water and Related Land Resources Systems.Google Scholar
  8. U.S. Army Corps of Engineers, 1973, General design memorandum for Divide Cut N-1, V-1.Google Scholar
  9. U.S. Army Corps of Engineers, 1975, Feature design memorandum N-2 Divide Cut.Google Scholar
  10. US. Army Corps of Engineers, 1978, Feature design memorandum N-1, Dewatering for Divide Cut, Section 4.Google Scholar

Copyright information

© Springer-Verlag New York Inc 1985

Authors and Affiliations

  • Marvin D. Simmons
    • 1
  1. 1.Geology SectionU S Army Corps of EngineersNashville

Personalised recommendations