Skip to main content
Log in

Productivities of multiple-hammer drills

  • Brief Communications
  • Published:
Soviet mining science Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. É. A. Vakher, “The use of multiple-spindle drilling rigs in open-cut mines,” Tr. In-ta Slantsev SNKh ÉSSR, No. 15 (1966).

  2. A. A. Tkachenko, “Analysis of technological standstills in self-propelled drill carriages,” Tr. IGD AN KazSSR,17, Alma-Ata (1966).

  3. A. Kaufmann, Methods and Models in Operational Research [Russian translation], Mir, Moscow (1966).

    Google Scholar 

  4. D. Cox and W. Smith, Queuing Theory [Russian translation], Mir, Moscow (1966).

    Google Scholar 

Download references

Authors

Additional information

Institute of Mining, Siberian Branch, Academy of Sciences of the USSR, Novosibirsk. Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 133–137, May–June, 1969.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Freidina, E.V. Productivities of multiple-hammer drills. Soviet Mining Science 5, 359–363 (1969). https://doi.org/10.1007/BF02501881

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02501881

Keywords

Navigation