Skip to main content
Log in

Optimum sequence of construction and reconstruction in open pits

  • Open-cut Mining
  • Published:
Soviet mining science Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. V. V. Novozhilov, Problems of Measuring Costs and Results in Optimal Planning [in Russian], Ékonomika, Moscow (1967).

    Google Scholar 

  2. K. E. Vinitskii and É. I. Reentovich, Mathematical Models of the Parameters of Systems of Open-Cut Mining [in Russian], Nauka, Moscow (1965).

    Google Scholar 

  3. N. V. Mel'nikov, K. E. Vinitskii, V. S. Men'shov, and É. I. Reentovich, A Method of Planning the Optimal Outputs of a Group of Open Pits [in Russian], Izd. IGD im. A. A. Skochinskogo, Moscow (1967).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 5, pp. 45–50, September–October, 1969.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mel'nikov, N.V., Reentovich, É.I., Vinitskii, K.E. et al. Optimum sequence of construction and reconstruction in open pits. Soviet Mining Science 5, 527–531 (1969). https://doi.org/10.1007/BF02501270

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02501270

Keywords

Navigation