Skip to main content
Log in

Selection of parameters for working mine takes by integer programming

  • Underground Mining
  • Published:
Soviet Mining Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. S. Tsoi and G. P. Danilina, Syntheses of Optimal Mine Working Networks [in Russian], Alma-Ata (1969).

  2. Branch Instructions for Determining Economic Efficiency of Capital Investment in the Coal Industry [in Russian], Moscow (1975).

  3. A. Kofman and A. Anri-Laborder, Methods and Models of Operations: Integer Programming [in Russian], Moscow (1977).

  4. A. S. Astakhov, Dynamic Methods of Estimating the Efficiency of Mine Production [in Russian], Moscow (1973).

Download references

Authors

Additional information

Sibgiproshakht, Novosibirsk. Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 93–96, November–December, 1979.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Shreider, D.Y., Kachevskii, N.A. Selection of parameters for working mine takes by integer programming. Soviet Mining Science 15, 614–616 (1979). https://doi.org/10.1007/BF02499607

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02499607

Keywords

Navigation