Production scheme for compensation injection of hardening mixtures in soils during the construction of a tunnel in Lefortovo

  • Underground Structures
  • Published:
Soil Mechanics and Foundation Engineering Aims and scope

Abstract

An alternate production scheme is proposed for compensation injection, which will provide for an increase in the three-dimensional stiffness of the foundation beds of buildings and parking areas located above a tunnel currently under design, and also entities falling into the activesettlement basin of the ground surface. Implementation of the scheme may be a critical link in the system employed to monitor the deformations of a soil mass in the most critical areas of construction.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. S. F. Pankina, V. V. Chebotyaev, V. A. Il'ichev, V. P. Petrukhin, and I. V. Kolybin, “General geotechnical concept of tunnel construction in Lefortovo (Moscow) and measures to protect historical buildings from deformations,”Osn., Fundam. Mekh. Gruntov, No. 2, 17–21 (1998).

    Google Scholar 

Download references

Authors

Additional information

Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 1, pp. 21–22, January–February, 2000.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Smoldyrev, A.E. Production scheme for compensation injection of hardening mixtures in soils during the construction of a tunnel in Lefortovo. Soil Mech Found Eng 37, 21–23 (2000). https://doi.org/10.1007/BF02484322

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02484322

Keywords

Navigation