Strengthening the walls of the No. 8 lock of the Moscow Canal by prestressed anchors

  • Reconstruction and Modernization of Hydro Developments
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    Overhaul of reinforced-concrete lock walls, in which such consequences of long and deep aging as sustained movements of the top of the walls into the chambers occurred, is a completely feasible task with the use of prestressed anchoring.

  2. 2.

    Heavy reinforcing of the reinforced-concrete walls and crowded conditions of conducting the works are not an obstacle (with the correct approach) for drilling anchor holes and tensioning the anchors.

  3. 3.

    The technology of anchoring with removable heads, including combining the two methods of creating prestressing — “against stops” and “against concrete,” is efficient and reliable. Such technology provides reliable fastening of the reinforcement being tensioned in a stretched state and permits conducting works under crowded conditions, where there is no room for placing the heads being left or the tensioning jack. Furthermore, such a method makes it possible to save expensive parts of the heads, using them many times.

  4. 4.

    The complexity of works on prestressed anchoring requires for conducting them the enlistment of specialized construction organizations possessing reliable technologies and having skilled personnel.

  5. 5.

    Gidroproekt's technology was sufficiently perfected, which provided a high technical effect from its use for strengthening the walls of the No. 8 lock with a high productivity of labor and a high quality of the works.

  6. 6.

    This technology can be used successfully also in many other cases, when it is required to repair old concrete and reinforced-concrete structures as well as stone masonry structures, where such signs of aging as through cracks and slow progressive movements of their separated parts appeared.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. V. E. Ni, “Results of observations of the state of hydraulic structures of the Moscow Canal,” Gidrotekh. Stroit., No. 12 (1977).

  2. V. E. Ni, “Inspection of the reliability and safety of hydraulic structures of the Moscow Canal,” Gidrotekh. Stroit., No. 6 (1987).

  3. V. E. Ni, Determination of Stresses in Retaining Walls of Hydraulic Structures [in Russian], Transport, Moscow (1995).

    Google Scholar 

  4. Yu. N. Zhukov, S. V. Ternavskii, Yu. O. Zal'tsman, and A. A. Lyubomirov, “Effectiveness of the repair of old reinforced-concrete walls of the No. 8 lock of the Moscow Canal by prestressed anchors,” Gidrotekh. Stroit., No. 11 (1996).

  5. V. B. Nikolaev and O. D. Rubin, “Improvement of methods of calculating the strength of reinforced-concrete members of hydraulic structures with construction joints,” Informénergo. Series 2. Hydroelectric Stations [in Russian], Informénergo, Moscow, No. 1 (1986).

    Google Scholar 

  6. O. N. Zolotov, “Computer-aided underground-structures research system,” in: Collection of Scientific Works of Gidroproekt [in Russian], No. 115 (1986).

  7. “Recommendations on the design and use of prestressed ground anchors,” in: Prestressed Reinforced Concrete (Based on the Proceedings of the Ninth FIP Congress) [in Russian], Stroiizdat, Moscow (1986).

  8. Technical Instructions on the Design, Manufacture, and Assembly of Built-Up Structural Members of Reinforced-Concrete Bridges [in Russian], VSN 98-74 (Mintransstroi), Orgtransstroi, Moscow (1975).

  9. I. N. Seregin and M. I. Sheintsvit, “Provision of reliable work of conical anchors,” Transp. Stroit., No. 7 (1985).

  10. Russian Patent No. 1742421, V. N. Zhukov's Method of Making a Flexible Tension Anchor [in Russian].

  11. V. N. Zhukov, S. V. Ternavski, Y. O. Zal'tzman, and A. A. Lyoubomirov, “Two examples of transmission of anchor loads to hydraulic structures without anchor heads,” in: Proceedings of the International Symposium on Anchors in Theory and Practice (Salzburg, Austria), October 9–10, 1995 A. A. Balkema, Rotterdam (1995), pp. 239–246.

    Google Scholar 

  12. Manual on the Technology of Manufacturing Prestressed Structural Members [in Russian], Stroiizdat, Moscow (1975).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 11, pp. 8–15, November, 1996.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Ternavskii, S.V., Zhukov, V.N., Zal'tsman, Y.O. et al. Strengthening the walls of the No. 8 lock of the Moscow Canal by prestressed anchors. Hydrotechnical Construction 30, 644–653 (1996). https://doi.org/10.1007/BF02447442