Skip to main content
Log in

Use of electropulse pile technology in hydrotechnical construction

  • Engineering Calculations and Production Efficiency
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 53–54, January, 1996.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kirillov, V.M., Egorov, A.L. & Yurkevich, B.N. Use of electropulse pile technology in hydrotechnical construction. Hydrotechnical Construction 30, 53–54 (1996). https://doi.org/10.1007/BF02446385

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02446385

Keywords

Navigation