Skip to main content
Log in

Method of on-site observations of underground structures

  • Research and Development
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

References

  1. S. A. Yufin, O. K. Postol'skaya, and V. I. Rechitskii, “Back analysis of the geotechnical situation during construction of underground structures,” Énerg. Stroit., No. 11 (1992).

  2. M. Hisatake, “Determination of optimum tunnel shape by three-dimensional back analysis,” in: Swoboda (editor), Numberical Methods in Geomechanics, Vol. 3, 6 (Innsbruck, 1988).

  3. G. Strang, Linear Algebra and Its Applications [Russian translation], Mir, Moscow (1980).

    Google Scholar 

  4. G. I. Marchuk, Methods of Computational Mathematics [in Russian], Nauka, Novosibirsk (1973).

    Google Scholar 

  5. A. N. Tikhonov and V. Ya. Arsenin. Methods of Solving Ill-Posed Problems [in Russian], Nauka, Moscow (1986)

    Google Scholar 

  6. G. I. Marchuk and Yu. A. Kuznetsov, “Solution of systems of linear equations by iterative methods,” in: Problems of the Accuracy and Efficiency of Computational Algorithms [in Russian], Inst. Kibernetiki Akad. Nauk. Ukr. SSR, Kiev, No. 1 (1969).

    Google Scholar 

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 10–15, January, 1996.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kassirova, N.A., Skvortsova, A.E. & Tatarnikova, E.G. Method of on-site observations of underground structures. Hydrotechnical Construction 30, 1–7 (1996). https://doi.org/10.1007/BF02446377

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02446377

Keywords

Navigation