Skip to main content
Log in

Seepage regime in the foundation of the Sayano-Shushenskoe dam during construction and operation

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    A tendency toward an increase of seepage discharges was observed in the dam foundation and bank abutments up to 1996, having reached 549 liters/sec in 1996 versus 240 liter/sec in 1990 and 190 liters/sec expected according to the design. This indicated the development of decompression of the foundation and grout curtain.

  2. 2.

    After repair works with the use of cement grouts at low upper pool levels, positive changes in the seepage regime did not occur: the hydraulic connection between holes along cracks both with and across the flow remains intact; the tendency toward an increase of discharges and heads behind the grout curtain remains.

  3. 3.

    When designating the technology of carrying out the grouting works and materials for subsequent repair operations, it is necessary to take into account the characteristics of the seepage state of the foundation: the amount of opening of the cracks in the foundation, the high seepage velocities, the active reaction to any external actions on the structure, the communication and hydraulic connection between local stretches of the foundation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Results of On-Site Observations of Seepage in the Dam Foundation (as of May 1981): Technical Report [in Russian], Gidrospetsstroi (1981).

  2. State of Hydraulic Structures and Foundation of the Sayano-Shushenskoe Hydrostation in 1984–1985: Technical Report [in Russian], SShGES (1986).

  3. State of Hydraulic Structures and Foundation of the Sayano-Shushenskoe Hydrostation in 1995: Technical Report [in Russian], LGTS OAO SShGES (1996).

  4. State of Structures of Sayano-Shushenskoe Hydrostation and Suggestion on Ensuring Reliability of the Dam-Foundation System: Technical Report [in Russian], LGTS OAO SShGES, Vol. 1 (1996).

  5. O. I. Margolina, “Characteristics of the organization of seepage monitoring on the dam of the Sayano-Shushenskoe hydrostation”,Gidrotekh. Stroit., No. 4 (1991).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 40–45, September, 1998.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Reshetnikova, E.N., Balashkina, T.G. Seepage regime in the foundation of the Sayano-Shushenskoe dam during construction and operation. Hydrotechnical Construction 32, 517–523 (1998). https://doi.org/10.1007/BF02443669

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02443669

Keywords

Navigation