Conclusions
-
1.
Construction and operation of the Sayano-Shushenskoe hydrostation has not introduced noticeable deviations into the terrestrial and aquatic ecosystems of the region with respect to the most important indices-climate and water quality.
-
2.
It is necessary to continue monitoring the aquatic and terrestrial ecosystems for accumulating a databank on the effect of the hydropower complex on the environment.
Similar content being viewed by others
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 19–22, September, 1998.
Rights and permissions
About this article
Cite this article
Stafievskii, V.A., Romov, L.Y. Effect of the Sayano-Shushenskoe hydropower complex on the environment. Hydrotechnical Construction 32, 494–497 (1998). https://doi.org/10.1007/BF02443664
Issue Date:
DOI: https://doi.org/10.1007/BF02443664