Skip to main content
Log in

Experience in reconstructing the structures and equipment at the Lower Tuloma hydroelectric station

  • Safety of Hydrotechnical Construction
  • Published:
Hydrotechnical Construction Aims and scope

Conclusion

Reconstruction will make it possible to provide reliable, trouble-free operation of the hydrostation; to reliably service the mechanical equipment operating underwater; to minimize diving operations when placing stop logs and cleaning the trash racks and will considerably accelerate them, which ultimately will make it possible to increase the generation of electricity.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 32–33, May, 1996.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Spitsyn, V.E. Experience in reconstructing the structures and equipment at the Lower Tuloma hydroelectric station. Hydrotechnical Construction 30, 271–273 (1996). https://doi.org/10.1007/BF02443101

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02443101

Keywords

Navigation