Hydraulic filling of tailings with a limited sand content

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    In the case of a limited content of sand in tailings (<30%) hydraulic filling of a tailings dump with the formation of a sand beach of sufficient length is possible, provided that the maximum bulk density of the hydraulic mixture is not exceeded (not above≥70% sand deposition for the investigated tailings dumps).

  2. 2.

    The results obtained are applicable under conditions similar to those which were investigated and can be used in the case of hydraulic filling of earth.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  1. P. D. Evdokimov, Design and Operation of Tailings Dumps of Concentration Mills [in Russian], Gosgortekhizdat (1960).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 10, pp. 11–13, October, 1970.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Volnin, B.A., Sarvin, G.T. Hydraulic filling of tailings with a limited sand content. Hydrotechnical Construction 4, 909–911 (1970). https://doi.org/10.1007/BF02435053

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02435053

Keywords

Navigation