Transporation of concrete mixes during construction of hydroelectric station systems

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The use of a single base of subsidiary-auxiliary plants for the construction of several hydroelectric plants in a cascade makes it possible to reduce the construction costs and to solve several special problems.

  2. 2.

    The PV admixture permits transporting concrete mixes in the bodies of universal dump trucks to distances of up to 100 km, without lowering the quality of the concrete.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 9–10, April, 1973.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Osipov, A.D. Transporation of concrete mixes during construction of hydroelectric station systems. Hydrotechnical Construction 8, 299–301 (1974). https://doi.org/10.1007/BF02406933

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02406933

Keywords

Navigation