Design of directed blast at the Kambaraty damsite on the Naryn River

  • At Construction Sites During the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. Engineering Rules for Conducting Blasting Work in Power Plant Construction [in Russian], Énergiya, Moscow (1972).

  2. Engineering Rules for Conducting Blasting Work on the Surface [in Russian], Nedra, Moscow (1972).

  3. G. I. Pokrovskii and I. S. Fedorov, Construction of Hydrotechnical Earth Structures by Directed Blasts [in Russian], Nedra, Moscow (1971).

    Google Scholar 

  4. M. F. Burshtein, “Investigation of directed rock fall blasted by deeply emplaced charges for major borrowpit stripping work in mountainous areas,” Author's Abstract of Candidate's Dissertation, Moscow Institute of Civil Engineering, Moscow (1970).

    Google Scholar 

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 18–20, May, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bagdasarov, A.G., Davydov, S.A. & Yushkovskii, L.M. Design of directed blast at the Kambaraty damsite on the Naryn River. Hydrotechnical Construction 11, 470–472 (1977). https://doi.org/10.1007/BF02403598

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02403598

Keywords

Navigation