    The investigations carried out on the testing ground of the Sayano-Shushenskoe hydroelectric station, under conditions most closely approximating working conditions, showed the technical possibility of concrete placement in the open, without tent protection, at subzero air temperatures down to −20° to −30°C.

  2. 2.

    For the open method of placing mass concrete blocks in hydrotechnical structures to be put into practice, special measures will have to be developed, taking into account the climatic and technological conditions for construction.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 13–14, May, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Brusse, A.G., Zinchenko, N.A. & Zubkov, V.I. Mass concrete placement under subzero temperatures. Hydrotechnical Construction 11, 460–462 (1977). https://doi.org/10.1007/BF02403595

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02403595

Keywords

Navigation