Skip to main content
Log in

New methods for compacting concrete

  • At Construction Sites During the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. L. I. Kudoyarov, E. P. Miklashevskii, and E. F. Freigofer, Mechanized Concrete Placement (A Review) [in Russian], Informénergo, Moscow (1975).

    Google Scholar 

  2. L. A. Tolkachev and V. B. Sudakov, The Toktogul Method of Concreting Massive Structures [in Russian], Énergiya, Moscow (1973).

    Google Scholar 

  3. A. V. Sklyarenko and V. A. Portnov, “Experience gained in organizing work for the construction of the arch dam for the Chirkey hydraulic facility,” Energeticheskoe Stroit., No. 8 (1974).

  4. G. D. Petrov and V. B. Safonov, “Characteristics of vibrator arrangement for array vibration,” Gidrotekh. Stroit., No. 11 (1974).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 9–13, May, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Miklashevskii, E.P. New methods for compacting concrete. Hydrotechnical Construction 11, 454–459 (1977). https://doi.org/10.1007/BF02403594

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02403594

Keywords

Navigation