Conclusions

  1. 1.

    Thanks to the correct vertical and horizontal disposition of the span of the main concrete-conveying trestle at the Ust'-Ilim hydroelectric plant, it was possible to introduce multipurpose mechanization and industrialization as well as a combined method for carrying out the concreting and erection work.

     
  2. 2.

    Construction of the concrete-conveying trestle at the Ust'-Ilim plant was highly economical, for it required a minimum quantity of materials. For this plant, only 4,600 tons of steel were fabricated; the remaining 25,500 tons was recovered from the Bratsk trestle.

     
  3. 3.

    The trestle spans previously used at the Bratsk plant, and later at the Ust'-Ilim plant, could be advantageously used again at the Boguchany hydroelectric plant.

     

Keywords

Energy Source Power Generation Minimum Quantity Power Engineer Renewable Energy Source 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Plenum Publishing Corporation 1974

Authors and Affiliations

  • G. A. Polonskii

There are no affiliations available

Personalised recommendations