Reservoir filling causes a change in the positions of plumb lines at large hydro developments by 1″ and more. The corrections due to such changes exceed the accuracy of determining settlements and horizontal displacements of dams and their foundations and therefore must be taken into account.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  1. P. S. Zakatov, Course in Higher Geodesy [in Russian], Nedra, Moscow (1964).

    Google Scholar 

  2. Instructions on Observations of Settlements and Horizontal Displacements of Hydraulic Structures by Geodetic Methods [in Russian], Gosénergoizdat, Moscow (1958).

  3. M. B. Ginzburg, Full-Scale Investigations of Large Hydraulic Structures [in Russian], Énergiya, Moscow (1964).

    Google Scholar 

  4. S. V. Elagin, “Effect of the mass of large hydraulic structures on deflection of a plumb line,” Izv. VUZ. Geodeziya i Aérofotos “emka,” No. 2 (1964).

  5. S. V. Elagin, “Introduction of gravity corrections in observations of the deformations of high dams,” Gidrotekh. Stroitel'., No. 5 (1966).

  6. M. Zaki, Untersuchungen über die sustematische Fehler and der Schachtlotung bei Staumauern, Zurich (1963).

  7. H. Werner, “Der Einfluss von Stauspiegelschwankunger auf mechanische Lotmessungen in Staumauern,” Vermessungstechnik, No. 10 (1970).

  8. M. Schneider, “Ein Auszahlverfahren zur Berücksichtung der Anziehung der angestauten Wasser bei Neigugsmessungen in Talsperren,” Vermessungstechnik, No. 6 (1971).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 47–48, March, 1974.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Karlson, A.A. Consideration of the effect of a change of position of plumb lines at large hydro developments. Hydrotechnical Construction 8, 257–259 (1974). https://doi.org/10.1007/BF02403389

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02403389

Keywords

Navigation