Advertisement

Hydrotechnical Construction

, Volume 10, Issue 5, pp 437–440 | Cite as

Starting and operating experience gained at the Dnepr-II hydroelectric plant

  • N. A. Dubovets
  • A. V. Papanov
Papers
  • 12 Downloads

Keywords

Energy Source Power Generation Power Engineer Renewable Energy Source Structural Foundation 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature Cited

  1. 1.
    T. P. Dotsenko and L. L. Levitskii, “The Dneprogés-II hydroelectric plant-project of the Ninth Five-Year Plan,” Gidrotekh. Stroitel., No. 4 (1974).Google Scholar
  2. 2.
    Yu. N. Chaikovskii, “Construction of cofferdams at the Dnepr-II hydroelectric station,” Gidrotekh. Stroitel', No. 5 (1975).Google Scholar

Copyright information

© Plenum Publishing Corporation 1976

Authors and Affiliations

  • N. A. Dubovets
  • A. V. Papanov

There are no affiliations available

Personalised recommendations