Skip to main content
Log in

Increasing the capacity of hydroelectric plant units in the Karelian power system

  • Rationalization and Exchange of Experience
  • Published:
Hydrotechnical Construction Aims and scope

Conclusion

Determining the capacity reserve of hydraulic turbines and subsequently increasing the capacity of generators constitutes one of the directions for utilizing the internal reserves of hydroelectric plants and more effectively using hydropower resources.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, p. 54, January, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Tsyvakin, V.G., Ganin, P.D. Increasing the capacity of hydroelectric plant units in the Karelian power system. Hydrotechnical Construction 11, 86–87 (1977). https://doi.org/10.1007/BF02398760

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02398760

Keywords

Navigation