Skip to main content
Log in

Experience with operation of the Rybinsk hydroelectric station hydropower equipment and structures

  • Construction Under the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. M. A. Balagurov, “Twenty five years of service of the sequence of hydroelectric stations on the Upper Volga,” Gidrotekh. Stroit., No. 6 (1967).

  2. N. A. Malyshev and M. M. Mal'tsev (editors), Twenty-Five Years of the Uglich and Rybinsk Hydroelectric Station [in Russian], Énergiya, Moscow (1967).

    Google Scholar 

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 39–43, January, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Chepurko, G.M. Experience with operation of the Rybinsk hydroelectric station hydropower equipment and structures. Hydrotechnical Construction 11, 61–66 (1977). https://doi.org/10.1007/BF02398755

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02398755

Keywords

Navigation