Skip to main content
Log in

The Bureya River hydroelectric development

  • Construction Under the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

“... To ensure a further rise in the economy of All-Union and Autonomous Republics and economic regions, autonomous provinces and national districts ....” “... In the Far East, to ensure the composite development of industry, an increased output of nonferrous, rare and precious metals and diamonds, and the production of goods by the timber, cellulose-paper-pulp, and furniture industries. To complete construction of the Zeya hydroelectric plant, commence construction of the Bureya hydroelectric plant, commission the first turbogenerators of the Kolyma hydroelectric plant ...” (From “Principal directions of development of national economy of the USSR during 1976–1980.”)

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 14–18, January, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Boyarskii, V.M., Grigor'ev, Y.A. & Teleshev, V.I. The Bureya River hydroelectric development. Hydrotechnical Construction 11, 20–26 (1977). https://doi.org/10.1007/BF02398747

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02398747

Keywords

Navigation