Skip to main content
Log in

Hydroelectric stations on the azusa and kurobe rivers in Japan

  • Foreign Experience and Techniques
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. Civil Engineering in Japan, Vol. 8, Japan Society of Civil Engineers (1969).

  2. New Method of Fault Treatment at Nagawado Dam, Tokyo Electric Power Co. Inc. (1969).

  3. Outline of Kurobegawa No. 4 Hydropower Station, Kansai Electric Power Co. Inc., Osaka, Japan.

  4. Mechanical Behavior of Kurobe-IV Dam, and Its Foundation, Especially the Difference from Calculations. Construction Department of the Kansai Electric Power Co. Inc., Paper Presented at the International Congress on Large Dams, Istambul (1967).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 44–49, September, 1970.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Domanskii, L.K., Grigor'ev, Y.A. & Rozanov, N.P. Hydroelectric stations on the azusa and kurobe rivers in Japan. Hydrotechnical Construction 4, 853–860 (1970). https://doi.org/10.1007/BF02397622

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02397622

Keywords

Navigation