A point-rating system for the quality of concrete work performed during construction of the UST'-Ilim hydroelectric plant

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    To provide for operational inspection and control over the quality of the continuous technological process of the preparation for placement and curing of hydraulic concrete, it is necessary to employ a point-rating system for observance of technological regulations established for specific construction.

  2. 2.

    To provide for an efficient quality-inspection-and-control, system, it is necessary to establish the relationship between payment and quality for all stages of the technological process.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  1. E. L. Danilenko and P. Ya. Starozhitskii, “Point-rating method for the control of technological processes,” Standarty i Kachestvo, No. 10 (1975).

  2. E. L. Danilenko, M. A. Sadovich, and P. Ya. Starozhitskii, “A system for the statistical inspection and quality control of concrete during construction of the Ust'-Ilim hydroelectric plant”, Énergeticheskoe Stroitel., No. 2 (1974).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 7–9, July, 1976.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Sadovich, M.A., Danilenko, E.L. A point-rating system for the quality of concrete work performed during construction of the UST'-Ilim hydroelectric plant. Hydrotechnical Construction 10, 649–651 (1976). https://doi.org/10.1007/BF02381807

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02381807

Keywords

Navigation