Conclusions
-
1.
To provide for operational inspection and control over the quality of the continuous technological process of the preparation for placement and curing of hydraulic concrete, it is necessary to employ a point-rating system for observance of technological regulations established for specific construction.
-
2.
To provide for an efficient quality-inspection-and-control, system, it is necessary to establish the relationship between payment and quality for all stages of the technological process.
Similar content being viewed by others
Literature Cited
E. L. Danilenko and P. Ya. Starozhitskii, “Point-rating method for the control of technological processes,” Standarty i Kachestvo, No. 10 (1975).
E. L. Danilenko, M. A. Sadovich, and P. Ya. Starozhitskii, “A system for the statistical inspection and quality control of concrete during construction of the Ust'-Ilim hydroelectric plant”, Énergeticheskoe Stroitel., No. 2 (1974).
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 7–9, July, 1976.
Rights and permissions
About this article
Cite this article
Sadovich, M.A., Danilenko, E.L. A point-rating system for the quality of concrete work performed during construction of the UST'-Ilim hydroelectric plant. Hydrotechnical Construction 10, 649–651 (1976). https://doi.org/10.1007/BF02381807
Issue Date:
DOI: https://doi.org/10.1007/BF02381807