Skip to main content
Log in

Construction during the 10th five-year plan (experience gained in placing concrete containing no coarse aggregate in the rize hydroelectric power plant)

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

From the Editorial Board. In placing the paper submitted by B. M. Erakhtin, E. V. Lavrinovich, et al., the editorial board recognizes that the technology of fine-grained concrete still requires serious refinement, partly in the preparation of the concrete mix, and in the methods employed to place it on slopes. The editorial board requests readers to express their opinion on this problem, taking into account the large volume of future work associated with s slope protection in regions with a deficiency of coarse aggregate for concrete.

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 5–7, July, 1976.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Erakhtin, B.M., Lavrinovich, E.V., Litvinova, R.E. et al. Construction during the 10th five-year plan (experience gained in placing concrete containing no coarse aggregate in the rize hydroelectric power plant). Hydrotechnical Construction 10, 645–648 (1976). https://doi.org/10.1007/BF02381806

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02381806

Keywords

Navigation