Skip to main content
Log in

Construction of an earth dam with crest spillway at the Toktogul hydroelectric station

  • Readers' Letters and Comments
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 56–57, May, 1969.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kuzovlev, G.M. Construction of an earth dam with crest spillway at the Toktogul hydroelectric station. Hydrotechnical Construction 3, 478–479 (1969). https://doi.org/10.1007/BF02381777

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02381777

Keywords

Navigation