Skip to main content
Log in

Experience in the operation of the Gumati No. 1 hydroelectric station reservoir

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. N. V. Polosin, “Experience in the construction of the Gumati No. 1 hydroelectric station on the Rioni River,” Gidrotekh. Stroitel', No. 2 (1962).

  2. L. G. Gvelesiani and N. P. Shmal'tsel', “Hydroelectric station mountain reservoirs,” Izv. TNISGÉI, 15 (1964).

  3. L. G. Gvelesiani and N. P. Shmal'tsel', “Experience in the operation of the Ladzhanur hydroelectric station reservoir,” Gidrotekhn. Stroitel'., No. 10 (1966).

  4. G. I. Chogovadze, Hydroelectric Station Construction in Georgia [in Georgian], Tbilisi (1968).

  5. L. G. Gvelesiani and N. P. Shmal'tsel', “Silting of hydroelectric station reservoirs,” Énergiya (1968).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 5–8, May, 1969.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Gvelesiani, L.G., Shmal'tsel', N.P. Experience in the operation of the Gumati No. 1 hydroelectric station reservoir. Hydrotechnical Construction 3, 401–405 (1969). https://doi.org/10.1007/BF02381761

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02381761

Keywords

Navigation