Skip to main content
Log in

Construction of the Mica hydro development

  • Foreign Experience and Techniques
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. Mica Dam — British Columbia Hydro and Power Authority, Caseco Consultants, Vancouver.

  2. V. G. Radchenko and A. P. Troitskii, “Construction of an earth dam,” Énergeticheskoe Stroitel'stvo za Rubezhom, No. 2 (1971).

  3. “120-ton rigs speed Mica dam fill,” Engineering News Record,182, No. 8.

  4. P. Meidal and J. L. Webster, “Mica: one of the world's largest structures,” Water Power, June (1973).

Download references

Authors

Additional information

Based on materials of an official business trip.

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 49–53, September, 1974.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mal'tsev, N.D., Minaev, E.V., Moiseev, I.S. et al. Construction of the Mica hydro development. Hydrotechnical Construction 8, 874–880 (1974). https://doi.org/10.1007/BF02380456

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02380456

Keywords

Navigation