Hydrotechnical Construction

, Volume 4, Issue 6, pp 487–495 | Cite as

The cascade of V. I. Lenin Mingechaur hydroelectric plants in the Azerbaidzhan SSR

  • Yu. R. Yusufov
Papers
  • 23 Downloads

Keywords

Energy Source Power Generation Power Engineer Renewable Energy Source Structural Foundation 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature Cited

  1. 1.
    S. S. Drozdovskii, “Hydraulic resources of the Azerbaidzhan SSR and their integrated utilization,” Gidrotekh. Stroitel'., No. 11 (1963).Google Scholar
  2. 2.
    “The construction projects contemplated in the fourth five-year plan. The Mingechaur hydraulic development,” Gidrotekh. Stroitel'., No. 4 (1947).Google Scholar
  3. 3.
    I. S. Zavalishin, “The Mingechaur hydraulic development,” Gidrotekh. Stroitel'., No. 4 (1949).Google Scholar
  4. 4.
    A. A. Zvontsov, “Experience with the construction of the hydraulic-fill dam of the Mingechaur hydroelectric plant,” Gidrotekh. Stroitel'., No. 1 (1956).Google Scholar