Repair work on a frozen dam

  • At Target Construction Projects
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    When repairing a frozen dam the freezing-through of the newly filled earth must be considered the main measure.

  2. 2.

    It is necessary to place low-permeability earth with thorough compaction in the crevasse.

  3. 3.

    The site of the crevasse must be equipped with additional temperature and piezometric holes for obtaining data on the soil condition.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 24–25, May, 1975.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Anisimov, V.A., Sorokin, V.A. Repair work on a frozen dam. Hydrotechnical Construction 9, 442–444 (1975). https://doi.org/10.1007/BF02379715

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02379715

Keywords

Navigation