Conclusions
-
1.
The Chirkey formwork complex can be used under rigorous climatic conditions, since the design of the formwork permits using any insulation, including insulated panels of the Ust'-Ilim type, that are left on the concrete, and also a canopy resting on the panels of the lower, lift. The entire complex provides safe conditions during formwork operations.
-
2.
To increase the service life of the formwork and reduce labor costs, the formwork must be manufactured by specialized plants with minimum size allowances.
-
3.
At the construction of the Chirkey dam the adopted direction of improving formwork operations by mechanization and automation of the transposition of formwork having a most simple design by creating a special transposer minimizes labor expenditures during operation with comparatively small initial expense, by virtue of which it is the most realistic direction and therefore should find use at other construction projects.
Similar content being viewed by others
Literature Cited
V. A. Portnov and A. V. Skylyarenko, “Experience in organizing construction work on the arch dam of the Chirkey hydro development,” Énergesticheskoe Stroitel'stvo, No. 8 (1974).
A. V. Dneprovskii and V. B. Freidman, “Improvement of formwork operation on the construction of the dam of the Ust'-Ilim hydroelectric station,” Énergeticheskoe Stroitel'stvo, No. 1 (1974).
A. P. Bechin et al., “Technical and economic effectiveness of the craneless concreting method,” Gidrotekh. Stroitel'stvo, No. 5 (1974).
A. V. Dneprovskii and M. B. Pospelov, “Current state and ways of improving formwork operations and formwork designs,” in: Summaries of Reports to the School of Advanced Experience [in Russian], Infoménergo (1974).
L. A. Tolkachev, “Experience in concreting the Toktogul hydroelectric dam,” Gidrotekh. Stroutel”., No. 12 (1971).
B. K. Frolov, “Construction of the Libby hydro development (USA),” Énergeticheskoe Stroitel'stvo, No. 6, (1971).
B. K. Frolov, “Features of concrete work in the construction of two large hydro schemes in the USA,” Gidrotekh. Stroitel”., No. 11 (1971).
N. I. Zinevich et al., “Self-lifting cantilever formwork for dam construction at the Toktogul hydroelectric plant,” Gidrotekh. Stroitel., No. 11 (1973).
E. A. Dolginin and E. E. Liskun, “Concreting operations at the Krasnoyar hydroelectric plant”, Gidrotekh. Stroitel'., No. 9 (1972).
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 15–20, May, 1975.
Rights and permissions
About this article
Cite this article
Portnov, V.A., Sklyarenko, A.V. Formwork operations on the construction of the arch dam of the Chirkey hydroelectric station. Hydrotechnical Construction 9, 429–436 (1975). https://doi.org/10.1007/BF02379713
Issue Date:
DOI: https://doi.org/10.1007/BF02379713