Skip to main content
Log in

Hydropower engineering in the USSR during the second world war 1941–1945

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. History of World War II of the Soviet Union 1941–1945 [in Russian], Vol. 2, Voenizdat MO Soyuza SSR, Moscow (1961), pp. 509–510.

  2. D. G. Zhimerin, History of Elecrification of the USSR [in Russian], Sotsekgiz, Moscow (1962).

    Google Scholar 

  3. S. F. Shershov, Soviet Electrical Power Engineering [in Russian], Gosénergoizdat, Moscow-Leningrad (1960).

    Google Scholar 

  4. P. S. Neporozhinii (editor), Electrification of the USSR (1917–1967) [in Russian], 2nd ed., Énergiya, Moscow (1970).

    Google Scholar 

  5. N. A. Malyshev and M. M. Mal'tsev (editors), 25 years of the Uglich and Rybinsk Hydroelectric Stations [in Russian], Énergiya, Moscow (1967).

    Google Scholar 

  6. L. A. Voronin, “Forty years of operation of the Lenin-Volkhnov hydrolectric station,” Gidrotekh. Stroitel'., No. 12 (1966).

Download references

Rights and permissions

Reprints and permissions

About this article

Cite this article

Hydropower engineering in the USSR during the second world war 1941–1945. Hydrotechnical Construction 9, 413–421 (1975). https://doi.org/10.1007/BF02379711

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02379711

Keywords

Navigation