Advertisement

Hydrotechnical Construction

, Volume 10, Issue 9, pp 883–888 | Cite as

Control of dam reliability at the Sayano-Shushenskoe hydroelectric plant

  • É. K. Aleksandrovskaya
  • A. I. Efimenko
  • F. I. Tebin
At the Construction Projects of the Five-Year Plan
  • 13 Downloads

Keywords

Energy Source Power Generation Power Engineer Renewable Energy Source Structural Foundation 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature Cited

  1. 1.
    É. K. Aleksandrovskaya and Yu. N. Gusev. “Project for full-scale investigations of stress conditions of the Sayany dam and its rock foundation,” Proceedings of Coordinating Conferences on Hydraulic Engineering [in Russian], No. 91 (1974).Google Scholar
  2. 2.
    Instructions for Organization of Full-Scale Observations and Investigations of Hydraulic Structures under Construction. VSN 01-74 of the Minérgo of the USSR, Énergiya, Moscow (1974).Google Scholar
  3. 3.
    Tentative Criteria on Supervision of Safety of Hydraulic Structures of Electric Plants [in Russian], STsNTI ORGRÉS, Moscow (1973).Google Scholar

Copyright information

© American Society of Civil Engineers 1976

Authors and Affiliations

  • É. K. Aleksandrovskaya
  • A. I. Efimenko
  • F. I. Tebin

There are no affiliations available

Personalised recommendations