Skip to main content
Log in

Improvement of underground hydraulic construction during the 10th five-year plan

  • Published:
Hydrotechnical Construction Aims and scope

“… In major construction, the main tasks are to increase the effectiveness of capital investments and to ensure further increase and qualitative improvement of basic funds, and to quickly place in operation and develop new production capacities in all branches of the national economy through improvement of planning, design, and organization of construction, reduction of the times of completion, and cutting of the construction costs…” “To make wider use in construction of new types of materials and products, effective reinforced-concrete elements fabricated from high-strength and light concretes, asbestos-cement elements, economical steel rolled shapes, products made from aluminum alloys, and wooden glued elements…” (From “Basic Directions of Development of the National Economy of the USSR during 1976–1980”)

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 3–7, September, 1976.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kuperman, V.L., Mazur, A.M. & Mostkov, V.M. Improvement of underground hydraulic construction during the 10th five-year plan. Hydrotechnical Construction 10, 850–854 (1976). https://doi.org/10.1007/BF02379548

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02379548

Keywords

Navigation