Skip to main content
Log in

Construction of tailings reservoirs by the hydraulic-fill method during the winter

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. G. T. Sarvin, “Investigation of the compaction of fine-grained material in the hydraulic-fill placing of tailings reservoirs,” Author's Abstract of Candidate's Thesis [in Russian], V. V. Kuibyshev MISI (1972).

  2. N. V. Zolotarev, “Heat engineering analyses for design of hydraulic-fill earth structures under winter conditions,” Izv. Vuzov. Arkhitektura i Stroitel'stvo, No. 6 (1962).

  3. V. A. Melent'ev, N. P. Kolpashnikov, and B. A. Volnin, Hydraulic-Fill Structures [in Russian], Énergiya, Moscow (1973).

    Google Scholar 

  4. Standard Instructions for Operation of Tailings Zones at Concentrating Plants [in Russian], Leningrad (1972).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 18–19, January, 1975.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Volnin, B.A., Sarvin, G.T. Construction of tailings reservoirs by the hydraulic-fill method during the winter. Hydrotechnical Construction 9, 28–29 (1975). https://doi.org/10.1007/BF02379422

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02379422

Keywords

Navigation