Skip to main content
Log in

Winter construction of dam at the Serebrynka-I hydroelectric plant

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 14–18, January, 1975.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Vasil'ev, A.F., Bukin, P.A. Winter construction of dam at the Serebrynka-I hydroelectric plant. Hydrotechnical Construction 9, 22–27 (1975). https://doi.org/10.1007/BF02379421

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02379421

Keywords

Navigation