Construction of the concrete plug at the base of the Nurek dam

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The concrete plug at the base of the Nurek Dam core is a complex structure which will operate under conditions of high pressures and seismicity, and in the presence of corrosive waters.

  2. 2.

    The sealing of construction and deformation joints, employing a stainless steel strip, and without using bituminous materials, is unique.

  3. 3.

    Under the conditions imposed by the narrow canyon, it is expedient to use the combined concrete-placement system, employing cranes mounted on Type SÉ-3 excavators, and Type MAZ-503 dump trucks tipping directly into the block from the bridging.

  4. 4.

    The control/measuring apparatus installed permits comprehensive observations to be made of the behavior of the structure.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

For a description of the Nurek Hydroelectric Station works, see Gidrotekhnicheskoe Stroitel'stvo, Nos. 1 and 5, 1970.

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 20–23, January, 1971.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Odintsov, A.K., Gladkov, B.F. Construction of the concrete plug at the base of the Nurek dam. Hydrotechnical Construction 5, 31–35 (1971). https://doi.org/10.1007/BF02379332

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02379332

Keywords

Navigation