Skip to main content
Log in

Gate chamber with a vertical-drop gate for deep outlets

  • Papers
  • At the Construction Projects of the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

To heads of 300 m and discharge of 100 m3/sec.

Translated from Gidrotechnicheskoe Stroitel'stvo, No. 12, pp. 13–16, December, 1977.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Chepaikin, G.A., Maksimov, V.V. Gate chamber with a vertical-drop gate for deep outlets. Hydrotechnical Construction 11, 1203–1208 (1977). https://doi.org/10.1007/BF02379030

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02379030

Keywords

Navigation